Facilities

CSIP Goal 7: Facilities


STRATEGIES:

ACTION STEPS:

PERFORMANCE MEASURES:

RESPONSIBLE PARTY:

TIMELINE:

Maintain current facilities.

Repair and reseal parking lots - rotating locations to reseal & repair every 3 years

Ongoing analysis of parking lots

  • Maintenance Director

  • Elementary 2018

  • High School 2019

  • Middle School 2020

Investigate the replacement of HS and MS driveway paths with concrete.

Ongoing analysis of parking lots

Maintenance Director

  • 2017-18

Repair and reseal roofs every 20 years

Ongoing analysis

Maintenance Director

  • Middle School - flat roof replacement 2018

  • Middle School roof sections 2019-2020

Athletic Facility Maintenance

  • Annual Gmax analysis on turf

  • Annual turf grooming

  • Annual sealing of concrete

  • Seal asphalt every three years

  • Annual bleacher inspection and maintenance

  • Maintenance of lower field


Ongoing analysis

  • Maintenance Director

  • Athletic Director

  • Annual grooming of turf

  • 2024 replacement of turf

  • Asphalt reseal 2020

  • Additional dirt and field repair 2018

Repair and replace HVAC systems

Ongoing analysis

Maintenance Director

  • Add HVAC in MS gym and locker rooms 2018

  • Annual inspection of HVAC systems

  • Annual inspection of boiler systems

Improve Energy Efficiency

Add LED lighting throughout the District

Annual analysis of energy efficiency

Maintenance Director

  • Upgrade parking lot lighting to energy efficiency lighting: HS 2017-18; EL 2018-19

  • MS Building - Phase 1, 2018-19

Maintain District Equipment

Purchase equipment needed in order to adequately maintain district facilities



Determine need of equipment

Maintenance Director

  • 2017-18 Tractor Purchase

  • Ongoing analysis of equipment

Website by SchoolMessenger Presence. © 2017 West Corporation. All rights reserved.